濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關信息發(fā)布和相關資訊,敬請關注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.xyhcw.cn/

地址:山東省濟南市章丘圣井工業(yè)園

當前位置: 首頁 > 新聞中心 > 常見問題

鋼筋加工棚的鋼管架設式過程

來源:http://www.xyhcw.cn/   發(fā)布時間:2022-05-26

現(xiàn)有技術中的鋼筋加工棚一般為鋼管架設式,相應的過程如下內容:
The reinforcement processing shed in the prior art is generally steel pipe erection type, and the corresponding process is as follows:
將多根鋼管在現(xiàn)場緊固架設,形成加工棚的整體鋼結構。鋼結構包括四個角處的四個鋼管立柱和四個鋼管。鋼管梁,每根鋼管梁的兩端分別與兩根鋼管柱的頂端固定,上述四根鋼管柱和四根鋼管梁構成整體鋼結構的鋼架,鋼結構還包括多根連接加強鋼管,每根連接加強鋼管的兩端分別固定在構成鋼骨架的兩根鋼管之間。
Several steel pipes are fastened and erected on site to form an integral steel structure of the processing shed. The steel structure includes four steel pipe columns and four steel pipes at four corners. The two ends of each steel pipe beam are respectively fixed with the top of two steel pipe columns. The above four steel pipe columns and four steel pipe beams form the steel frame of the overall steel structure. The steel structure also includes a plurality of connecting reinforcing steel pipes, and the two ends of each connecting reinforcing steel pipe are respectively fixed between the two steel pipes forming the steel frame.
鋼管架設的鋼結構完成后,驗證鋼結構的強度是否符合設計要求,然后在鋼結構頂部鋪設一層彩鋼板。然后,將多根垂直鋼管焊接在鋼結構的四根鋼管梁上,然后將平行于鋼管梁的水平鋼筋和同排的垂直鋼管通過緊固件緊固固定。鋼管和四根水平鋼筋構成防墜落防護欄桿。然后將標語和橫幅掛在欄桿上,整個鋼筋加工棚的施工就完成了。
After the steel structure erected with steel pipes is completed, verify whether the strength of the steel structure meets the design requirements, and then lay a layer of color steel plate on the top of the steel structure. Then, a plurality of vertical steel pipes are welded on the four steel pipe beams of the steel structure, and then the horizontal reinforcement parallel to the steel pipe beam and the vertical steel pipes in the same row are fastened and fixed through fasteners. Steel pipes and four horizontal steel bars form fall protection railings. The construction is finished and the safety banner is hung on the railing.
鋼筋加工棚
工程考慮到施工工期、施工場地和要求,故在選擇方案時,應充分考慮以下幾點:
Considering the construction period, construction site and safety requirements of the project, the following points shall be fully considered when selecting the scheme:
1、架體的結構設計,力求做到結構要可靠,造價經濟合理。
1. The structural design of the frame shall strive to ensure that the structure shall be safe and reliable and the cost shall be economical and reasonable.
2、在規(guī)定的條件下和規(guī)定的使用期限內,能夠充分滿足預期的性和耐久性。
2. It can fully meet the expected safety and durability under the specified conditions and within the specified service life.
3、選用材料時,力求做到常見通用、可周轉利用,便于保養(yǎng)維修。
3. When selecting materials, strive to be common, reusable and convenient for maintenance.
4、結構選型時,力求做到受力明確,構造措施到位,搭拆方便,便于檢查驗收。
4. When selecting the structure, strive to make the stress clear, the structural measures in place, and the erection and disassembly convenient for inspection and acceptance.
5、綜合以上幾點,鋼筋加工棚的搭設,要符合文明標化工地的有關標準。
5. Based on the above points, the erection of reinforcement processing shed shall meet the relevant standards of civilized and standardized construction site.
此外鋼筋加工棚具有多次拆裝、重復使用、牢固、整齊、美觀、拆裝方便等優(yōu)點,而且使用有不同的尺寸,在不同的工程中需要選擇不同的尺寸,所以要根據(jù)實際情況來定下,詳細的內容可以關注網(wǎng)站www.xyhcw.cn咨詢了解到!
In addition, the reinforcement processing shed has the advantages of multiple disassembly, reuse, firmness, tidiness, beauty, convenient disassembly and other advantages, and it has different sizes. Different sizes need to be selected in different projects, so it should be determined according to the actual situation. For details, please refer to the website www.jnpfjc Com consulting learned!